top of page
Mark Westley Drainlayer Limited
At Mark Westley Drainlayer Limited we offer over 30 years experience in various drainlaying projects including:
* New house drains
* Pipe repairs
* Maintenance and renewal
* Install new septic tanks
* Effluent trenches
* Blocked drains
* Soak pits for stormwater
* Strip drains and sumps
* Small to Medium Earthworks
* Hole Boring
* Rock / Concrete Breaking
* Retaining Walls
* Truck and Digger Hire
For a no obligation free quote call 027 542 2277 today.
April 2024
Aniseed Valley Road, Richmond
Lay sewer from septic tank to effluent field. Install new effluent field.
Client Feedback:
"Many thanks for a great job and problem solved"
"You were so pleasant to deal with and the job was very neat and tidy"
From Sue
April 2024
Harper Street, Nelson
Harper Street, Nelson
New soak pit and down pipes. Dug and laid.
First Job for 2024
Honest Lawyer, Monaco, Nelson
Install two sumps and resurface parking area.
2023 Jobs
Elaine Bay, Marlborough Sounds
Job to replace clay pipes and install new AES system on bach.
Kawai Street, Nelson South
Job to replace old clay pipes to new PVC pipes.
Waimea Road, Nelson South
Engineered retention pit.
Jobs Completed 2018
Small house drain with water tank up St Arnaud
Strip drain installed alongside house to pick up surface water that was
getting into the basement below.
New gully and toilet install for existing downstairs garage.
Drains on new house in Mapua subdivision.
Installed new sump, placed drainage behind wall and hooked up new existing downpipe for a client ... feedback below ...
Thanks Mark
Outstanding Job!
Cheers,
David Rijnink
Job November 2017
Latest job completed for client. Stormwater issues with flooding out the back now all sorted with new channel drains installed with sumps to takeaway the water from the house.
Before
​
Client, Heather Tidswell, said "Mark has done a magnificent job and there is no ponding now (which we have had since I moved in in 2011). Everything was tidied up nicely and he kept us advised about the project daily. Awesome work, bring on the rain!"
After
bottom of page